FORMOSA PLASTICS CORPORATION

Project: CWTP – CCND Loading Arm Expansion Project

GRI completed expansion of FPC-TX’s existing wastewater facilities, as well as expanded their Ethylene Glycol Loading capacity. GRI delivered a quality product, while keeping safety at the forefront of the project.


EPM 54 DOCK PROJECT

Project for the CCND loading arms and DTF connection piping installation. GRI was the EPC for the balance of plant design, fabrication, and construction of loading arm to dock connection piping, dock racks, and installation of 7 loading arms.


crystal River

This is from our Crystal River, FL job. We are building (4) tanks for Duke Energy there.

 


GRI engineered, fabricated, and installed 7 new field-erected API storage tanks, 2 clarifiers, and 1 shop tank and delivered them to the client in St. James, Louisiana.