train 1 & 2 installation

GRI was contracted to fabricate and install over 14,000 lf of piping. Included in the scope of the contract was civil foundations, setting all process equipment including tanks, vessels, conveyor systems and pumps, grouting and equipment alignment. GRI erected the flare stack, installed process tubing, tested and commissioned the unit.


 

30,000 MANHOURS

9 months

$2,500,000

SCOPE OF WORK:

  • Pipe Fabrication

  • Pipe Installation

  • Civil Foundations

  • Tank Setting

  • Vessel Setting

  • Installation of Conveyor System

  • Installation of Pumps

  • Grouting of Equipment

  • Equipment Alignment

  • Flare Stack Erection

  • Testing

  • Commissioning